Abitibi Consolidated
Grand Falls, NL

 

Trade: Upgrades, refits, installations

Description: In this 2002 project for Abitibi Consolidated, we installed a hydraulic governor system during a refit of the Grand Falls Mill.  During the refit, we also completed chemical cleaning, hydrotesting, and hot oil flushing of the hydraulic governor piping system.

Pennecon Concrete Division supplied over 1300 metric tonnes of rebar for this project. The rebar was fabricated in St. John's and shipped to Grand Falls.

 

Contact:

Eddy Knox
(709) 726-3490
(709) 7726-3729
eknox@hydraulic-systems.com