Description: With expertise in the rigors of supplying aggregate to the offshore petroleum industry, Pennecon Concrete shipped in excess of 300,000 tonnes of aggregate to the Terra Nova Oil Field over a two year period. The rock was used for securing lines and as an insulator on the seabed. Bay Bulls Marine Terminal was constructed, by Pennecon Limited, as a shore-based facility to cater to Pennecon Concrete's offshore contract. Pennecon is currently expanding the facility with room to develop specialized handling and transshipment services. |