Wastewater Treatment facility St. John's, NL
Description: Approximately 2000 metric tonnes of rebar are being fabricated at the plant facility, shipped to the site and installed according to engineer’s specifications.
Contact:
Pennecon Concrete (709) 782-3404 (709) 782-0129 pennecon@pennecon.com