Description: In February 2010, Capital Ready Mix was awarded a contract from Vale Inco Newfoundland & Labrador Ltd to
supply, erect and operate two Concrete Batch Plants at the site of Vale's Long Harbour Processing Plant.
With an anticipated 120,000 m3 of concrete over a 27 month period, the two plants are capable of producing 100m3 per/hr combined total,
with primary plant capable of 80m3 per/hr. and secondary or back-up capable of 50m3 per/hr.
Both plants are fully automated, winterized and totally independent of each other.
|